GLOBAL REACH FZE

home products Engineering Grouts Industrial Flooring Compound

Industrial Flooring Compound

Product Details:

Function Floor Hardner
Product Material Cemanticious
Place of Origin United Arab Emirates
Brand Name Fairmate

Payment & Shipping Terms:

Payment Terms: L/C,T/T

Detailed Product Description


DESCRIPTION

 

FAIRTOP is ready to use single pack, hard wearing, abrasion resistant, smooth finish anti skid industrial flooring compound for medium to heavy duty traffic floors. It resists penetration of oil and water. FAIRTOP is ready to use material the application is also very simple.

 

APPARATUS

Flat trowel for levelling

 

SURFACE PREPARATION

 

As FAIRTOP is applied over fresh concrete, no surface preparation is required.

MIXING AND APPLICATION

  • FAIRTOP is ready to use material, so no mixing is required before using it.

  • After laying of base concrete, when a person puts thumb on the concrete, the concrete should not stick on thumb but the impression of thumb remains on concrete, at that time sprinkling of FAIRTOP powder should be done on base concrete.

  • The sprinkling rate of FAIRTOP is 5kg/m2, so accordingly one can estimate the total quantity of FAIRTOP. After calculating total quantity of FAIRTOP, divide the quantity in four parts.

(I) Sprinkle FAIRTOP by hand on peripherial area of width 100-150mm. When surface darkens with absorption of water, it is levelled with flat trowel or power float using dixc attachment. In areas where saw cut joints are tobe located, an extra quantity of floor hardner can be applied. Ensure that edges are fully Compacted.
(II) Sprinkle second part of FAIRTOP immediately after levelling of first part. Second part should be sprinkled evenly on entire area including the peripherial area and when surface darkens, level it with flat Trowel.
(III) After 2hrs. of first levelling, again the surface is levelled to close any pores and remove any adulations on the surface.

The surface should be covered with a polythene sheet after final levelling and made air tight by placing sand around the sheet for a minimum period of 7 days.

Send your message to this supplier
« Prev Product 1 2 3 Next Product »

Other Products from this Supplier

Company Info

GLOBAL REACH FZE
[United Arab Emirates]
[Verified Member]

City: Sharjah
Province/State: Sharjah
Country/Region : United Arab Emirates

Business Type:Trading Company

View Contact Details

Email this page Bookmark this page Print this Page